DIRECTOR APPOINTED MR YI ZHANG
DIRECTOR APPOINTED MR JIFENG YE
ADOPT ARTICLES 06/12/2012
APPOINTMENT TERMINATED, DIRECTOR GEOFFREY HOLMES
APPOINTMENT TERMINATED, DIRECTOR DOUGLAS WHYTE
APPOINTMENT TERMINATED, DIRECTOR ADRIAN GAVIN
APPOINTMENT TERMINATED, DIRECTOR PHILIP DOLAN
DIRECTOR APPOINTED MR PAUL WARWICK
NOTICE OF THE ISSUE OF A SUBMARINE PIPELINE WORKS AUTHORISATION, Edinburgh Gazette, 26 February 2010
PLACES WHERE A MAP OR MAPS MAY BE INSPECTED, Edinburgh Gazette, 9 February 2010
NOTICE OF APPLICATION FOR A SUBMARINE PIPELINE WORKS AUTHORISATION, Edinburgh Gazette, 1 December 2009
Talisman Energy (UK) Limited, Edinburgh Gazette, 13 July 2007
Talisman Energy (UK) Limited, Edinburgh Gazette, 6 March 2007
Talisman Energy (UK) Limited, Edinburgh Gazette, 6 February 2007
Talisman Energy (UK) Limited, Edinburgh Gazette, 15 September 2006
Talisman Energy (UK) Limited, Edinburgh Gazette, 9 June 2006
Talisman Energy (UK) Limited, Edinburgh Gazette, 26 May 2006
NOTICE OF APPLICATION FOR A SUBMARINE PIPELINE WORKS AUTHORISATION, Edinburgh Gazette, 9 April 2013
Bleo Holm/Talisman Energy (UK), , Scotland
Bleo Holm/Talisman Energy (UK), , Scotland
Buchan A/Talisman Energy (UK), Buchan A, , Scotland
Buchan A/Talisman Energy (UK), Buchan A, , Scotland
Clyde/Talisman Energy (UK) Lim, , Scotland
Bleo Holm/Talisman Energy (UK), , Scotland
Montrose/Talisman Energy (UK), Offshore, Offshore, , Scotland
Fulmar A/Talisman Energy (UK), Fulmar A, GBR, , Scotland
Arbroath/Talisman Energy (UK), Offshore, Offshore, , Scotland
20-22 BEDFORD ROW, LONDON, WC1R 4JS, United Kingdom
No suitable safe system of work which includes suitable and sufficient arrangements for the rescue of any casualty.
Where a permit to work is required, there are no arrangements for securing that a person does not do such work, save in accordance with the terms o...
IN on Deck Cargo Securing. You have failed to make effective arrangements for the planning, organisation, control, monitoring and review of the saf...
Improvement Notice 301367959 The winch platform provided by Talisman Energy UK Ltd for the use of the Diving Team working on the installation is no...
Buchan A IN re Vertical Ladder Access. You have failed to ensure the health and safety of your employees and others not in your employment by: 1.no...
Clyde - 1 * IN re control measures for potable water and risk of legionella You have failed to implement adequate control measures within your pota...
Bleo Holm IN re employees safety at work and others 1. You did not ensure so far as is reasonably practicable the safety at work of your employees ...
1 x IN Standards of Hygiene on Installation You are not complying with the requirements of paragraph 66 of Schedule 1 of the Regulations in that y...
Fulmar IN*1 Maintenance of Plant in Efficient Working Order and Good Repair You have not ensured that plant on the installation is maintained in ef...
1. A Temporary Refuge (TR) damper closure test was performed on the 13/01/11 and the accommodation damper (sited adjacent to the sick bay and prima...
register id: Z6606040